St. Phillips College
AZTECA Designs, Inc was awarded this project that consisted of 35,000 SF of ceramic removal and ceramic wall removal. We had four crews working simultaneously.… Read More »St. Phillips College
AZTECA Designs, Inc was awarded this project that consisted of 35,000 SF of ceramic removal and ceramic wall removal. We had four crews working simultaneously.… Read More »St. Phillips College
AZTECA was called out after the client was not happy working with another vendor. AZTECA met with UTSA listened to what there goal was and… Read More »University of Texas at San Antonio
AZTECA Designs, Inc was requested to build a 20×40 wood deck that consisted of 3’ deep by 18” pillars to be installed. We then installed… Read More »Brooks City Base
AZTECA Designs, Inc was awarded a mold remediation project with VIA Metropolitan, we abated two floors that contained mold in the walls, and removed windows,… Read More »VIA Metropolitan
AZTECA Designs, Inc was hired to remove existing stain concrete, prep floor as needed and install stain concrete.
AZTECA Designs, Inc was hired to install the floor in the GYM at LBJ, when Cecilia saw the tile to be installed she immediately asked… Read More »Edgewood I.S.D.